Skeptics of the proposed hyperscale data center in Box Elder County are sweating about a lot more than its energy demands and potential toll on water supplies.
9 is not the total energy. The article says the total thermal load is 16. 9 for the electrical usage and another 7-8 in the form of cooling. It also says that’s the amount of 40,000 Walmart Supercenters…if you want another non standard American unit of measurement
9 is not the total energy. The article says the total thermal load is 16. 9 for the electrical usage and another 7-8 in the form of cooling. It also says that’s the amount of 40,000 Walmart Supercenters…if you want another non standard American unit of measurement