Skeptics of the proposed hyperscale data center in Box Elder County are sweating about a lot more than its energy demands and potential toll on water supplies.
If you want a standard unit of measurement, I trust you can re-read the title and find “9GW” in there. That is a proper standard unit, but to most people a number so mindbogglingly huge makes no sense at all, so they added a comparison to something people are more likely to being able to even roughly conceptualize.
If you want a standard unit of measurement, I trust you can re-read the title and find “9GW” in there. That is a proper standard unit, but to most people a number so mindbogglingly huge makes no sense at all, so they added a comparison to something people are more likely to being able to even roughly conceptualize.
That 9gw is not the whole amount. the total thermal load is 16GW.
Which according to the pdf is equal to 40,000 Walmart supercenters if someone needs a non standard, American unit of measurement…
Thats enough power to send Doc and Marty on 14 and half trips through time.